| Project: |
Chlorine Booster Facility and Chemical Feed Systems |
| Project Manager: |
Shane Swensen - Email
Email the Project Manager
|
| Engineering Contract Date: |
8/14/2009 |
| Estimated Bid Documents Available: |
October 2010 |
| Project Description: |
This project includes the design and construction of three chemical feed systems. The first includes a new chlorination facility in Salt Lake County. This new facility will include a 2,000 sq. ft. building with chemical tanks, pumps, electrical equipment and additional vaults. The next two systems include the replacement of chemical feed systems at an existing water treatment plant in Salt Lake County. It will include the demolition and removal of the existing systems and replacement with new chemical feed systems and equipment.
|
| Estimated Construction Cost: |
1,750,000.00
|