Project Details
Project: 900 East - Distribution Pipeline Replacement
Project Type: Pipeline
Project Manager: Jan Erickson - Email Email
Prequalification Submittals Due: 5/7/2010 3:00 PM
Engineering Contract Date: 1/8/2008
Consultant: Stantec Consulting
Estimated Bid Documents Available: 2010-05-03
Construction Contract Date: 6/9/2010
Bids Due: 5/19/2010 2:00 PM
General Contractor: Whitaker Construction
Project Description: Approximately 2 miles of 16-inch fusible plastic pipe with main line connections and service connections along 900 East from 5290 South to 6400 South (Winchester Street) in Murray, Utah.